Page 19 - Kolter Plan for Royal Oak in Titusville Florida
P. 19
Infrastructure
• Disruption of Service: There will be no disruption of service. All
connections will be made to mains that will be kept live at all times.
• Water Flow: The plan will improve water flow and water quality by
connecting (looping) the existing system in multiple locations to
improve flow, pressure and flushing.
• Pipes: All on-site water and sewer systems will be constructed of all
new materials meeting current city, state and federal standards.