Page 19 - Kolter Plan for Royal Oak in Titusville Florida
P. 19

Infrastructure









                • Disruption of Service:  There will be no disruption of service. All

                   connections will be made to mains that will be kept live at all times.




                • Water Flow:  The plan will improve water flow and water quality by

                   connecting (looping) the existing system in multiple locations to


                   improve flow, pressure and flushing.



                • Pipes: All on-site water and sewer systems will be constructed of all


                   new materials meeting current city, state and federal standards.
   14   15   16   17   18   19   20   21   22   23   24